BergVoll Charging Discuss your project

BergVoll Charging · Charging infrastructure for Switzerland

First the site.
Then the charging station.

Charging stations from 3.5 to 960 kW – specified for your site. Choose your site and instantly see charging class, number of charging points and grid demand. BergVoll GmbH in Steinhausen ZG supplies the hardware from Jidian (Geely group) and plans with your electrician.

Live diagramApartment building & condominium ownership (Stockwerkeigentum)
Diagram Apartment building & condominium ownership (Stockwerkeigentum): 12 × WPC 11 kW Grid 35 kW Load management +7 more
  • Grid 35 kW
  • PV
  • Load management
  • 12 charging points
Recommendation12 × WPC 11 kW
Grid connection35 kW – with load management
  • 3.5–22 kWAC wallboxes
  • 60–160 kWDC fast chargers
  • up to 960 kWSystem output, liquid-cooled
  • PV · Storage · V2GMicrogrid solutions

02 Project Check

Your site in numbers.

Guide values in seconds: energy demand, charging class, number of charging points and grid connection – with a project sheet to print or forward.

pcs
km
h
%
h
Time window in which charging takes place. For DC, it counts towards the number of charging points.
kW
Unknown? Enter 0. Building connection in amperes? At 3 × 400 V, 1 A corresponds to roughly 0.69 kW (e.g. 63 A ≈ 43 kW).
days
Diagram Apartment building & condominium ownership (Stockwerkeigentum): 12 × WPC 11 kW Grid 35 kW Load management +7 more
  • Grid 35 kW
  • PV
  • Load management
  • 12 charging points
Recommendation12 × WPC 11 kWWallbox Power Charging · AC wallbox
Energy per charge
7.9 kWh
Energy per year
35 MWh
Charging time at full power
43 min
Connection without load management
132 kW
Connection with load management
12 kW
Grid connection
35 kW – with load management
  • A 22 kW wallbox is possible. However, most vehicles charge on AC at no more than 11 kW – so we calculate with 11 kW.
  • Without load management the connection is not sufficient – with dynamic power distribution it is.
Send to BergVoll

Guide values based on mileage, consumption (car 18, van 25, truck 120 kWh/100 km) and dwell time, including roughly 10 % charging losses; load management with a 25 % reserve. Does not replace planning by a qualified electrical professional.

03 Charging family

One family – from 3.5 kW to 960 kW.

Four charging classes and one energy system – so the technology fits the site, not the other way round. The output figures come from the product overview in the manufacturer’s profile. For the European version with Type 2 and CCS2, the values in the data sheet apply.

Output ranges of the charging classes on a logarithmic scale from 3.5 to 960 kW: WPC 3.5–22 kW, FPC 60–160 kW, GPC 120–600 kW system output, HPC 240–960 kW system output.
WPC Wallbox Power Charging

WPCAC wallbox

Wallbox Power Charging

3.5–22 kW

  • Single-phase 7 kW (32 A) – in Switzerland usually limited to 3.6 kVA, ask the grid operator
  • Three-phase 11 kW (16 A)
  • Three-phase 22 kW (32 A)
  • European version with Type 2

Suited to: Residential, workplace, hotel, depot overnight

FPC Fast Power Charging

FPCDC fast charger

Fast Power Charging

60–160 kW

  • DC output 60–160 kW
  • Compact charging posts
  • European version with CCS2
  • For dwell times from 30 min to 2 h

Suited to: Office, retail, car dealer, municipality, fleet with shift work

GPC Giga Power Charging

GPCDC system, liquid-cooled

Giga Power Charging

120–600 kW system

  • System output 120–600 kW
  • Charging current 250 A or 650 A
  • Power cabinet + terminals
  • Dynamic power distribution

Suited to: Car park, logistics, transport hubs, trucks

HPC Hyper Power Charging

HPCDC system, liquid-cooled

Hyper Power Charging

240–960 kW system

  • System output 240–960 kW
  • Up to 800 kW per charging point (according to the manufacturer’s profile)
  • 1 power cabinet, up to 8 terminals
  • Liquid-cooled cables

Suited to: Charging park, motorway, truck opportunity charging

Microgrid PV, storage & V2G

MicrogridEnergy system

PV, storage & V2G

site-dependent

  • PV + battery storage + charging
  • Bidirectional energy control (V2G)
  • Cloud control and edge computing
  • Grid-connected or off-grid

Suited to: Sites with a tight grid connection or their own PV

Images: manufacturer photos; the version for Europe may differ.

How long does it take to add 150 km of range?

Guide value. For DC, we assume 80 % of the charging power on average. The vehicle’s charging curve limits the power further.

Power cabinet of a liquid-cooled charging system
Power cabinet: it supplies several terminals and directs the power to wherever charging is happening. Image: manufacturer.

04 References

Built, not just planned.

Manufacturer projects – from a hotel and a football stadium to a truck charging park. Filter by your site.

Hotel underground car park, Ningbo
Hotel underground car park, NingboHPC V3 charging station at the Nanyuan Universe Hotel – part of a fast-charging network for the Zeekr brand.
Juguang Center, Hangzhou
Juguang Center, HangzhouHPC V4 charging station in the outdoor car park at the Juguang Center.
Xingyao Center, Hangzhou
Xingyao Center, HangzhouHPC V2 charging station at the Xingyao Center.
Polestar station, Guangzhou
Polestar station, GuangzhouFast-charging station of a premium car brand in the underground car park of a shopping and business complex.
Motorway fast-charging station, China
Motorway fast-charging station, ChinaFast-charging station on the motorway. The manufacturer has built such stations both grid-connected and off-grid.
Motorway charging area, China
Motorway charging area, ChinaSeveral fast-charging posts at a rest area.
Truck charging station, Inner Mongolia
Truck charging station, Inner MongoliaFast-charging station for heavy commercial vehicles.
Truck charging station, Inner Mongolia
Truck charging station, Inner MongoliaCharging area for heavy commercial vehicles.
Quzhou football stadium
Quzhou football stadiumGPC charging station at a municipal football stadium – part of a charging network of the city’s investment company.
PV-storage charging station with V2G, Quzhou
PV-storage charging station with V2G, QuzhouDemonstration station with solar roof, storage and bidirectional charging.
Geely Viridi E-Mobility factory site
Geely Viridi E-Mobility factory siteCharging station with wind, PV and storage at a Geely group production site.
Zeekr headquarters, research institute
Zeekr headquarters, research instituteWind-PV-storage charging station at the headquarters of the Zeekr brand.
PV-storage charging project Daicun, Hangzhou
PV-storage charging project Daicun, HangzhouCovered charging spaces with photovoltaics and battery storage.

Projects in China, delivered by the manufacturer. Source: Hangzhou Jidian Electronic Technology manufacturer profile, as of 03/2026.

05 Why BergVoll

A Swiss contact. Technology from the car industry.

01

Thinking from the site

We do not start with the catalogue but with your car park: dwell times, vehicles, grid connection. The setup follows from that.

02

One contact in Switzerland

BergVoll GmbH in Steinhausen ZG supports you from the needs analysis to commissioning. Your contractual partner is a Swiss company.

03

The whole power family

From the 3.5 kW wallbox to the 960 kW system from a single source. You do not have to look for a new supplier for each charging class.

04

Quality from the car industry

The manufacturer develops electronics for car makers: certified to IATF 16949 and ISO 26262, ASPICE Level 2 (process assessment), laboratory accredited to ISO/IEC 17025 – according to the manufacturer’s profile.

05

The manufacturer’s service structure

According to the manufacturer: 11 employees on site, 12 partner service points and 13 spare-parts warehouses in the EU, the United Kingdom, Norway and Iceland – not in Switzerland. Here, BergVoll is your contact.

06

Start small, expand later

Microgrid, storage and bidirectional charging (V2G) are part of the product family. You start with what is needed today.

The manufacturer’s production site in Hangzhou (visualisation)
Hangzhou site. Image: manufacturer.

The technology behind it

Jidian – a company of the Geely group

Hangzhou Jidian Electronic Technology was founded in 2022 and is 100 % owned by the Geely group. In Hangzhou, Jidian develops and produces charging stations, on-board chargers, battery management and control units for electric vehicles.

100 %
Subsidiary of the Geely group
345,000 m²
Floor area at the Hangzhou site
800 kW
per charging point (HPC), according to the manufacturer’s profile
500,000
On-board chargers (22 kW) annual capacity

According to the manufacturer’s profile, Jidian supplies electronics and charging technology for brands such as

  • Geely
  • Lynk & Co
  • Geometry
  • Volvo
  • Polestar
  • smart
  • Zeekr

Information according to Hangzhou Jidian Electronic Technology manufacturer profile, as of 03/2026.

06 Process

How your project runs.

  1. 1

    Site check

    We clarify vehicles, dwell times, grid connection and goals – gladly directly on site.

  2. 2

    Concept & quotation

    You receive a setup with charging classes, number of charging points, load management and grid demand – including a quotation.

  3. 3

    Grid & installation

    Clarification with the distribution system operator. Installation is carried out by a licensed electrician – yours or one we select together.

  4. 4

    Delivery & commissioning

    BergVoll supplies the hardware and supports commissioning.

  5. 5

    Operation & expansion

    We remain your contact for questions and spare parts – and for expansion when more vehicles come along.

07 FAQ

Frequently asked questions.

Something missing? Write to us – we reply personally.

Which vehicles can charge?

The version for Europe uses Type 2 (AC) and CCS2 (DC) – the standards of electric cars sold in Europe. We confirm the performance data of the European version with the data sheet. How fast a car actually charges ultimately also depends on the vehicle itself.

Is our grid connection sufficient?

Often yes – with load management. The Project Check shows the connection capacity with and without load management. If the connection is too tight, we examine battery storage, PV or an increase with the distribution system operator.

What does the grid operator need?

Your electrician submits the required notifications, for example the installation notice and – depending on the output – a technical connection request. We clarify which documents your grid operator requires at the start of the project.

What is load management?

A controller distributes the available power across all charging points. If several vehicles charge at the same time, each gets a little less – with a long dwell time, nobody notices.

How is billing handled?

There are three common routes: your own back end, a third-party billing platform, or billing via the energy supplier. Which one suits depends on the site – per apartment, per employee, per guest. Which interfaces the devices support, e.g. OCPP, we confirm with the data sheet.

What applies to condominium ownership (Stockwerkeigentum)?

The base installation in common areas generally requires a resolution of the owners’ meeting and a cost allocation. What has proved effective: first the base installation for all spaces, the wallbox for each household later. Whether a ZEV/vZEV (self-consumption communities) makes sense with a solar system, we assess in the project.

Can we start small?

Yes. Often the base installation is done for all parking spaces, and the charging stations are added as needed.

Are there subsidies?

Some cantons, municipalities and energy suppliers subsidise charging infrastructure. The conditions vary – we check this for your location.

Who provides service and spare parts?

BergVoll is your contact in Switzerland. According to the manufacturer, there are 12 partner service points and 13 spare-parts warehouses in the EU, the United Kingdom, Norway and Iceland – not in Switzerland.

How accurate is the Project Check?

It provides guide values based on mileage, consumption and dwell time, including roughly 10 % charging losses. It does not replace planning by a qualified electrical professional.

08 Contact

Discuss your project.

Send us your project sheet or describe your site in two sentences. You will receive an initial setup with charging classes and grid demand.

Juan OteroBusiness Development +41 78 344 90 17info@bergvoll.com BergVoll GmbH
Eichholzweg 4
6312 Steinhausen ZG
Discuss your project